Default Image
Case Study

Optimizing Supply Chain Performance for a Global HVAC Manufacturer

Challenge
  • Complex distribution: 6 domestic production sites + overseas factories supplying 100+ HVAC models.
  • Manual planning inefficiencies: Stockouts due to delayed replenishment decisions.
  • Transport bottlenecks: Unbalanced capacity across warehouses.
Solution

ImplementedΒ Hitachi’s Supply Chain Optimization (SCO) to:

  • Modelled the entire supply chain:
    Digital twin covering factories, warehouses, and delivery centers.
    Simulated demand scenarios for domestic/imported products.
  • Automate supply planning:
    Dynamic inventory allocation based on sales plans and backlog.
    Transportation optimization (lot sizes, lead times, capacity rules).
Result
  • Higher fulfillment rates potential uncovered through 20% fewer stockouts in simulations.
  • Reduced excess stock: Safety stock aligned with demand patterns.
  • Validated scalability: Tested across 109 models and 5 logistics scenarios.
Key benefits include:

20%
Reduction in stockouts

Reduced excess stock

Tested across 109 models